Conveyor Transfer Points

Attention: open in a new window. PDFPrintE-mail

Chile-nitrate-mine-Transfer-Point-Before-FogDust before the Dry Fog™ System was installed

Chile-nitrate-mine-Transfer-Point-After-Fog
After Dry Fog™ System was installed only residual fog escapes the skirting cover

 Dry Fog™ Systems use very little water with nozzles rated in Gallons Per HOUR not minute.  Studies have shown that Dry Fog systems cost of operation and maintenance to be approximately 25% of that of a collection system (see Mine Cost Study). Dry Fog will not freeze and can operate in temperatures as low as –35% F.